RFQ Checklist
- Load (N), loaded speed (mm/s) and stroke (mm)
- Supply voltage, current budget and control interface
- Retracted length, mounting drawing and available space
- Duty cycle, temperature and lifetime acceptance criteria
- Prototype quantity, annual forecast and delivery destination